How do you schedule a reviewed PDF?
Open the ready PDF in Drafts and check every page, the sender and the recipient. Select the checkbox confirming that you reviewed the prepared PDF and recipient. After entering a Send time, select Review send time. Confirm the fax, recipient and time, then choose Confirm scheduled fax. BunnyFax opens Scheduled once it saves the approval.
Which time zone does BunnyFax use?
The Send time label shows your browser’s time zone. Convert from the recipient’s local time for the date you picked. For example, 9:00 a.m. in New York on November 18, 2026 is 6:00 a.m. in Los Angeles. Check the date and zone on the review screen, especially when clocks change. Integrations send an explicit UTC time instead.
When are pages reserved?
A pending schedule holds no pages. After the chosen time, BunnyFax checks the approved draft, your current access, your sending number and the available allowance before admitting the fax to Outbox. If the schedule crosses into a new billing period, the allowance in effect at admission applies. If the PDF or permissions change or you lack available pages, check the Needs review status and resolve the issue before confirming another send.
How do you cancel or change a scheduled fax?
Open Scheduled while the fax is still pending. Choose Cancel schedule, review the recipient and time, then choose Confirm schedule cancellation. To change the time or document, cancel the pending schedule first and approve a fresh one. Once admitted, use View in Outbox to check whether the separate ten-second cancellation window is still open.
Does the scheduled time tell you when the fax arrived?
The chosen time is the earliest BunnyFax starts checking whether the fax can enter Outbox. The actual delivery time depends on when the fax is admitted and transmitted. Check the final result in Outbox and save the delivery receipt when the fax is delivered. Allow time for transmission and follow-up if you have a deadline.
What should you check when switching fax services?
Fax.Plus documents a time-zone selector in its web and mobile scheduling flow. Before moving a recurring workflow, verify how your replacement displays the chosen time, how long cancellation is available, and when the service checks the page allowance. Use a test document and a line you control to verify the timing and receipt.
Sources
Sources checked